Built functional prototypes of a twin degassing tank in PP by developing and assembling three injection molded parts using the hot plate welding process

Client: CONFIDENTIAL
Industry: Automotive
Region: India / Europe
Process: Production Tooling, Injection Molding

Requirement

  • Indian subsidiary of a France-based Tier-1 Supplier was developing a new twin degassing tank for an Indian Auto OEM
  • Required an assembled functional prototype in Polypropylene within a development time frame of 4 weeks
  • Design had three parts that needed to be assembled using hot plate welding
  • Parts to be used for prototype cars in North America

Project Details

Part Details

Part Name: Twin Degassing Tank
Application: Functional Prototyping
Quantity: 350

Manufacturing Details

Processes: Prototype Tooling, Injection Molding, Hot Plate Welding
Material: Polypropylene

Delivery Details
  • Tooling developed within 4 weeks
  • Hot plate welding process optimized for assembly

Approach

  • Conducted DFM and Moldflow analysis for the three parts
  • Prototype tool developed
  • Specific grade of PP imported as per requirement
  • Post production refinements with Tristone to optimize the hot plate welding process, developed fixtures and joined parts for final assembly
  • Checking Fixtures and Gauges designed and manufactured to measure tight tolerances required
  • Final quality inspection

Impact

  • Developed and delivered prototype tooling within 4 weeks, one-third the time required for production tooling (12 weeks)
  • Tight tolerances achieved for dimensional accuracy
  • Managed supply chain efficiently to adhere to development timelines